CCTV footage from under Whitechapel in east London shows a fatberg that weighs as much as 11 double decker buses and is the length of two football pitches blocking the sewer. It is mostly made up of fat, wet wipes and nappies, and is expected to take three weeks to clear'Total monster': fatberg blocks London sewage system Continue reading...
Vast fatberg blocks London sewage system - video
12. září 2017 18:17
Příroda
Celý článek: https://www.theguardian.com/environment/video/2017/sep/12/vast-fatberg-blocks-london-sewage-system-video
Zdroj: The Guardian