HS2 accused of breaching cycle crossing commitments along high speed route

18. červenece 2018 15:01

Příroda

Government-owned company has back-pedalled on its pledge to cycle-proof the line, say campaigners, locking out cyclists for generations to comeThe company building the HS2 high speed rail line is accused of watering down commitments on cycle crossings along the route, in a move campaigners say will endanger lives and lock out cycling for generations to come.The government-owned company, HS2 Ltd, was accused of back-pedalling on its legally-binding assurance that it would "cycle-proof" phase 1 of HS2, from London to the West Midlands, earlier this year by Cycling UK, the national cycling charity. The assurances, which became legally binding when they were incorporated into the High Speed Rail Act, stated HS2 Ltd would have a dialogue with the Cycle Proofing Working Group (CPWG), a government advisory body, with the assumption that they would include high quality design standards. Continue reading...
25.4.
24.4.

Partneři

Asekol - zpětný odběr vysloužilého elektrozařízení
Ekolamp - zpětný odběr světelných zdrojů
ELEKTROWIN - kolektivní systém svetelné zdroje, elektronická zařízení
EKO-KOM - systém sběru a recyklace obalových odpadů
INISOFT - software pro odpady a životní prostředí
ELKOPLAST CZ, s.r.o. - česká rodinná výrobní společnost která působí především v oblasti odpadového hospodářství a hospodaření s vodou
NEVAJGLUJ a.s. - kolektivní systém pro plnění povinností pro tabákové výrobky s filtry a filtry uváděné na trh pro použití v kombinaci s tabákovými výrobky
E.ON Energy Globe oceňuje projekty a nápady, které pomáhají šetřit přírodu a energii
Ukliďme Česko - dobrovolnické úklidy
Kam s ním? - snadné a rychlé vyhledání míst ve vašem okolí, kde se můžete legálně zbavit nechtěných věcí a odpadů