UK 'will take 700 years' to reach low-carbon heating under current plans

8. října 2020 9:45

Příroda

Energy experts say record rise in new gas boilers installed shows UK going in wrong directionMinisters must come forward with stringent new plans for low-carbon heating, as targets to insulate homes and generate more power from offshore wind are inadequate and sales of gas boilers showed a record rise last year, energy experts warned.At current rates, it will take 700 years for the UK to move to low-carbon heating, and at least 19,000 homes a week must be upgraded between now and 2050. There was a record rise last year of 1.8% in the number of new gas boilers installed, showing that the UK is going in the wrong direction. Continue reading...
24.4.
23.4.

Partneři

Asekol - zpětný odběr vysloužilého elektrozařízení
Ekolamp - zpětný odběr světelných zdrojů
ELEKTROWIN - kolektivní systém svetelné zdroje, elektronická zařízení
EKO-KOM - systém sběru a recyklace obalových odpadů
INISOFT - software pro odpady a životní prostředí
ELKOPLAST CZ, s.r.o. - česká rodinná výrobní společnost která působí především v oblasti odpadového hospodářství a hospodaření s vodou
NEVAJGLUJ a.s. - kolektivní systém pro plnění povinností pro tabákové výrobky s filtry a filtry uváděné na trh pro použití v kombinaci s tabákovými výrobky
E.ON Energy Globe oceňuje projekty a nápady, které pomáhají šetřit přírodu a energii
Ukliďme Česko - dobrovolnické úklidy
Kam s ním? - snadné a rychlé vyhledání míst ve vašem okolí, kde se můžete legálně zbavit nechtěných věcí a odpadů