Čtvrtek, 18. dubna 2024

Tendr - Projekt správy vodních zdrojů

Tendr - Projekt správy vodních zdrojů
Brazil Ceara Integrated Water Resource Management Project/Preparation of Environmental Studies and Environmental Impact Assessment and Environmental Impact Report, Population Cadastral Survey and Resettlement Plans Stav tendru: výzva k projevení zájmu Banka: Světová banka Datum uzávěrky: 02.12.2002 Klíčová slova: slu?by konzultantské , vodohospodářství , ?ivotní prostředí Popis: Projekt správy vodních zdrojů ve státě Ceara V rámci projektu jsou po?adovány konzultantské slu?by v oblasti vodohospodářství a ?ivotního prostředí. Procurement NoticeCountry: Brazil Project: CEARA INTEGRATED WATER RESOURCE MANAGEMENT PROJECT Financing: World Bank Abstract: PREPARATION OF ENVIRONMENTAL STUDIES AND ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL IMPACT REPORT, POPULATION CADASTRAL SURVEY AND RESETTLEMENT PLANS Sector: Consultants Loan/Credit Number: Loan No. 4531-BR Contract/Bid Number: Expressions of Interest Deadline: 2 December 2002 This request for expressions of interest follows the general procurement notice for this project that appeared in UN Development Business No. 582 of 16 May 2002. The Government of the State of Ceará, through the Secretariat of Water Resources (SRH), has received a loan in various currencies from the International Bank for Reconstruction and Development (BRD) toward the cost of the Ceará Water Resource Management and Integration Project (PROGERIRH/CE), and intends to apply part of the loan proceeds to payments under the contract for the Preparation of Environmental Studies and Environmental Impact Assessment and Environmental Impact Report (EIA/RIMA), Population Cadastral Survey and Resettlement Plans. Services include the Execution of Environmental Studies and EIA/RIMA, Population Cadasters and Resettlement Plans for: Midwest/Ibiapaba/Acaraú Pipeline and Fronteiras Reservoir ? Platô do Poti Pipeline, to be executed over a period of 12 months Inhunçu, Arabę and Lontras Dams, Tunnel and Small Hydroelectric Plant (SHP), to be executed over the period of 12 months Macacos and Jacurutu Dams, to be executed over the period of 12 months Paula Pessoa, Frecheirinha and Tiaia Dams, to be executed over the period of 12 months Firms should express their interest in the assignment of their choice. The respective shortlisted firms will be defined for each assignment specified above. The SRH now invites eligible consultants to indicate their interest in executing one or more above mentioned assignments. Interested consultants must provide evidence of their qualification to perform the services (catalogues, brochures, description of similar services performed, experience under similar conditions, availability of adequate staff and availability of that staff to perform the services, etc.), by delivering their portfolios to the address below, by mail or through their respective representatives, not later than 2 December 2002. Consultants may associate to enhance their qualifications. A consultant will be selected in accordance with the World Bank?s Guidelines: Selection and Employment of Consultants by World Bank Borrowers, January 1997 (revised September 1997 and January 1999), under Quality and Cost-Based Selection Method (QCBS), for the execution of one or more assignments. Interested consultants may obtain further information at the address below from Monday through Friday, from 0800 to 1200 hours and 1400 to 1800 hours (local time). Contact: SRH. Secretariat of Water Resources. Special Project Management Unit (UGPE). Av. General Afonso de Albuquerque Lima, S/N. Centro Administrativo Governador Virgílio Távora. Edif. SEDUC, Bloco ?C?, 1 Andar. CEP 60830-120. Fortaleza, Ceará, Brazil. Tel: (55-85) 488-8551, 488-8555. Fax: (55-85) 488-8576, 488-8587. E-mail: progerirh@srh.ce.gov.br; wiliam@srh.ce.gov.br publikováno: 05.11.2002
Sdílet článek na sociálních sítích

Partneři

Asekol - zpětný odběr vysloužilého elektrozařízení
Ekolamp - zpětný odběr světelných zdrojů
ELEKTROWIN - kolektivní systém svetelné zdroje, elektronická zařízení
EKO-KOM - systém sběru a recyklace obalových odpadů
INISOFT - software pro odpady a životní prostředí
ELKOPLAST CZ, s.r.o. - česká rodinná výrobní společnost která působí především v oblasti odpadového hospodářství a hospodaření s vodou
NEVAJGLUJ a.s. - kolektivní systém pro plnění povinností pro tabákové výrobky s filtry a filtry uváděné na trh pro použití v kombinaci s tabákovými výrobky
E.ON Energy Globe oceňuje projekty a nápady, které pomáhají šetřit přírodu a energii
Ukliďme Česko - dobrovolnické úklidy
Kam s ním? - snadné a rychlé vyhledání míst ve vašem okolí, kde se můžete legálně zbavit nechtěných věcí a odpadů