The project\'s primary objective as a short-term measure is to eliminate the emission of 18,962 tons of methane from the municipal landfill of Las Rosas in Maldonado. The project will build a methane recovery system upon the existing waste pile and six landfill cells and produce electricity to be sold to the national grid owned by UTE. The Project supports investments in civil works and equipment (gas capture, 0.8 MW generation plant, monitoring) and technical assistance (engineering planning, project management, training, dissemination, and evaluation).
The installation of the plant is foreseen to be completed by the end of 2004.
Site Information
Start of Landfill (Year):
1997 (1989 as open dump)
Closing of Landfill (Year/year expected):
2018
TotalSite area (hectares):
19
Area Designated for Land Filling (hectares):
19
Estimated site Capacity at Time of Site Closure (Million tons):
0.16
Estimated Capacity of Waste in Place (2003)(Million tons):