'It's been beyond difficult': earthworks of HS2 take toll on Chilterns residents

2. října 2025 1:01

Příroda

Locals complain of a changed landscape, flooding, dust and disruption as rail project cuts through area of outstanding natural beautyUK fifth-worst country in Europe for loss of green space to development'Desecration of landscape': the fight over development in areas of outstanding natural beautyMargaret Bunce used to look from her cottage window over a swoop of fields of wheat and small copses. Now when she opens her curtains each morning, the rural valley between Great Missenden and Wendover is dominated by the concrete and earthworks of HS2.Orange-clad men and their yellow diggers and dumpers are building cuttings and viaducts to take the high-speed railway on its path through a swath of the Chilterns area of outstanding natural beauty (AONB), now known as a national landscape. Continue reading...
3.10.
2.10.

Partneři

Asekol - zpětný odběr vysloužilého elektrozařízení
ELEKTROWIN - kolektivní systém svetelné zdroje, elektronická zařízení
EKO-KOM - systém sběru a recyklace obalových odpadů
INISOFT - software pro odpady a životní prostředí
NEVAJGLUJ a.s. - kolektivní systém pro plnění povinností pro tabákové výrobky s filtry a filtry uváděné na trh pro použití v kombinaci s tabákovými výrobky
E.ON Energy Globe oceňuje projekty a nápady, které pomáhají šetřit přírodu a energii
Ukliďme Česko - dobrovolnické úklidy
Kam s ním? - snadné a rychlé vyhledání míst ve vašem okolí, kde se můžete legálně zbavit nechtěných věcí a odpadů